APC Smart-UPS VT SUVTP15KH2B4S User Manual

Product codes
SUVTP15KH2B4S
Page of 4
2
Caution: Ensure that the floor is level. The enclosure 
cannot be installed on a floor that is not level.
Space considerations
Note: Allow for enough working space behind the 
enclosure for electrical work to be carried out (e.g. if you 
want to connect an XR Battery Enclosure at a later stage).
10-20 kVA. 
10-40 kVA. 
* All physical installations must comply with local standards.
Unpacking
Unpack the enclosures
Caution: Do not unpack the units before the time of the 
installation.
Note: If the system is not being installed immediately, do 
not remove the packaging. Store the system in an indoor, 
temperature-controlled area, free of conductive contaminats.
Heavy: There must be two people to roll the enclosure from 
the pallet.
Note: Save four bolts for attaching the stabilizing brackets 
to the 352 mm (13.85 in) enclosure. See “Stabilizing 
Brackets” .
Land packaging. 
Front-to-rear 
airflow
Floor-to-ceiling 
ventilation:
523 mm
(20 in)
Minimum
front clearance:
Minimum
rear 
clearance*:
828 mm 
(32.99 in)
100 mm
(4 in)
356 mm
(14 in)
1000 mm 
(39.3 in)
Enclosure
356 mm
(14 in)
Front-to-rear 
airflow
Floor-to-ceiling 
ventilation:
523 mm
(20 in)
Minimum
front clearance:
Minimum
rear 
clearance*:
828 mm 
(32.99 in)
100 mm
(4 in)
559 mm
(22 in)
1000 mm 
(39.3 in)
Enclosure
559 mm
(22 in)
 Cut carefully along the 
edges to remove the plastic 
and to free the ramp.
 Place the ramp by aligning 
the velcro strips on the ramp 
with the velcro strips on the 
front edge of the pallet.
 Remove the cardboard 
cover.
 Remove the corner 
protection and the plastic bag.
 Remove the bolts from the 
brackets attaching the 
enclosure to the pallet and 
save the brackets for floor 
anchoring, if required. 
 Roll the unit off the pallet.
Ramp