Haier fhv5sgww User Manual

Page of 61
                                                       
Freezer                    Model:FHV5SGWW/FHV7SGWW
 
 
39 
MAINTENANCE SERVICE AND TROUBLE SHOOTING
 
Maintenance Service and Trouble Shooting
 
 
(1) It is not allowed to fill R134a by R12 filling equipment. 
(2) Please  keep  the  pliers,  pipe  cutting  unit  and  Hansen  valve  clean,  and 
keep them away from grease dirt. 
12.5.3 Procedure for filling equipment 
(1) Preparation before use 
①  Visually inspect recovery machine for abnormalities, etc. 
②  Keep all valves closed to equipment until really to proceed. 
(2) Evacuation 
①  Connect recovery machine hoses to system fittings 
②  Switch on power. 
③  Switch on motor. 
④  Open all related valves. 
⑤  Observe the pointer of vacuum meter when it is accessing the mark 
–1. 
⑥  Evacuation time shall not be less than 45 min. 
⑦  After evacuation close valves. 
PDF created with pdfFactory trial version