Haier lc-162g2 User Manual

Page of 11
Preparation before Usage 
1.Remove all packing material, including foam base, all tapes used 
to fasten the annex. 
2.Check annex and data: check the articles in the box according to 
the “packing list”. 
3.Before usage, clean the product, for detail refers to “clean” part. 
4.Foot adjustment : Adjust the foot according to the ground 
situation to make the product stable so as to lessen shock and 
noise.  
5.StewingAfter being moved, the product should be stewing for 
more than 30 minutes, and then the power can be connected.   
6.Connect to powerMake a trial operation after connecting to 
power, if obvious cooling down can be felt after one hour, it means 
the cabinet is in normal operation. 
7. Thru-hole pinThere is a thru-hole pin in the data-bag. When 
being used for the first time, it should be placed in the water outlet. 
In the using process, the water outlet should be straightway to 
allow the frost melting water flow into the water box inside the 
engine chamber through the water outlet. When being blocked, 
the thru-hole pin inside the water outlet should be taken out, 
being cleaned and then put into original place.   
AttentionThru-hole pin should not be used as a too to clean 
the water outlet, and can only be placed inside the water outlet 
to avoid the block of the water outlet.