Newco moo-cafe User Guide

Page of 36
 
7
 
 
Equipment Start-Up Procedure 
 
 
 
1.  Plug machine into electrical supply [120V, 1.8 KW, 15A,] [240V, 3 poles, 4 
wire grounding type Twist-Plug Receptacle. For 240V units, Use L6-20R or 
L6-30R, 2 pole, 3 wire Twist-Plug Receptacle].  Hot water tank will start 
filling. 
2.  Activate the Light switch (Toggle Up) located on the inside of the door. 
3.  The LCD window will display self-test message briefly, sanitation indicators 
will light (will not sanitize until tank reaches 160 deg). (The sanitation cycle 
can be cancelled by pushing the Rinse/Auto-Rinse button). 
4.  Allow approximately 6-8 minutes for the tank to fill.  If the tank does not fill 
up within the first 10 minutes an error message will appear in the LCD 
window FIL.  (See Definition of Screen and Troubleshooting Guide).  The 
machine is factory preset to dispense water at the rate of 20-25 oz. /30 sec. 
For hot water & 30-32 OZ. /30 sec. for cold water.   
5.   Allow up to 50 minutes for the water to reach a temperature of 175°F.  The 
heat up time will depend on the water inlet temperature, the input voltage.   
6.  This unit is equipped with a pump safety interlock switch activated by 
opening and closing the door.  When door is open, concentrate pumps will 
not operate. 
7.  Set-up and calibrate the Moo Products for each channel while the machine 
is heating. 
 
 
 
Equipment Calibration 
 
 
Machine Hot & Cold water volumes have been pre-set at the factory.  These 
volumes have been programmed into the software.  It is necessary however to 
calibrate the Product Concentrate for each dispense channel in order for the 
machine to allow digital calibration of correct Water to Product Ratio. 
 
Moo Concentrate Milk Products will dispense 6-9 ounces of product within 30 
seconds, depending on product flavor, as each product blend has slightly 
different viscosities. 
 
When machine is equipped with “Coffee Kit” liquid coffees will dispense in 3-5 
oz/30 sec. ranges