Bunn SRU User Guide

Page of 36
Page 13
DISCO
NNEC
T FRO
M PO
WER S
OURC
E
BEFO
RE RE
MOVA
L OF A
NY PA
NEL O
R
REPL
ACEM
ENT O
F ANY
 COM
PONE
NT!
WAR
NING
!
AT
TE
NT
ION
:  T
UR
OF
F  W
HE
UN
AT
TE
ND
ED
AT
TE
NT
ION
:  T
UR
OF
F  W
HE
UN
AT
TE
ND
ED
SERVICE
This section provides procedures for testing and 
replacing  various  major  components  used  in  this 
brewer should service become necessary.  Refer to 
Troubleshooting for  assistance  in  determining  the 
cause of any problem.
WARNING - Inspection, testing, and repair of electri-
cal equipment should be performed only by qualified 
service personnel.  The brewer should be unplugged 
when servicing, except when electrical tests are re-
quired and the test procedure specifically states to 
plug in the brewer.
COMPONENT ACCESS
WARNING
 - Disconnect the brewer from the power 
source before the removal of any panel or the replace-
ment of any component.
 
The control thermostat, limit thermostat, pump, 
solenoid valve, liquid level probe and tank heater are 
accessible by removal of  the swing spout, front cupola 
cover, rear cupola cover and the cupola.
 
Disconnect the swing spout nut from the swing 
spout base fitting. Remove swing spout.
 
Remove the four #8-3 screws, two on each side, 
securing the side covers to the cupola.
 
Slip cupola off of the component bracket.
 
The on/off switch, selector switch, start switch, 
timer, contactor and liquid level control board are ac-
cessible by removal of the front lower panel.
 
Remove the four #8-3 screws securing the front 
access panel to the base.
 
The circuit breaker, fuse and fuse holder are ac-
cessible by removal of the rear utility cover.
 
Remove the six #8-3 screws securing the rear 
utility cover to the housing.
FIG. 1 COMPONENT ACCESS
P053.5
Contents
Circuit Breaker  .....................................................14 
Contactor ..............................................................15
Control Thermostat ...............................................17
Fuse and Fuse Holder  ...........................................18
Limit Thermostat ...................................................19
Liquid Level Board and Level Probe  .................... 0
ON/OFF Switch ......................................................
Pump ....................................................................3
Selector Switch (Half Batch) .................................4
Solenoid  ...............................................................5
Start Switch (Brew) ...............................................6
Tank Heater ...........................................................8
Thermal Cut-off  ................................................... 9
Timer (Early Models).............................................30
Digital Brew Timer (Late Models) ..........................3
Wiring Diagrams ...................................... 34 thru 36
10067 08000