Cma -180uc Quick Setup Guide

Page of 1
2
STEP
Connect hard wire power supply from dishmachine 
to power box. (Two hot wires, one neutral and one 
ground.)
Level dishmachine by adjusting leveling legs. 
Dishmachine must be level front and back. 
Connect dishmachine to hot water source, minimum 
temperature 140
∞. If 140∞ is not available, order a  3 
minute timer cycle (120
∞ minimum temperature 
required).
When ever possible, 
remove pump drain if a floor
drain is available near by. Remove drain pipe and
place drain hose on the drain valve and allow
machine to gravity drain.
3-2007
3
STEP
4
STEP
180UC 
Quick Setup 
Instructions
180UC REAR VIEW
NEUTRAL
HOT
GROUND
DRAIN HOSE
HARD WIRE
 FOUR WIRE
POWER SUPPLY
1/2" WATER INLET
DRAIN VALVE
RINSE 
INJECTION
110V POWER
CONNECTION
FOR DISPENSER
DETERGENT 
INJECTION
WASH
SENSOR
RINSE
SENSOR
PUMP DRAIN
MOTOR
LEVELING
LEGS
1
2
3
4
1
STEP
FLOOR DRAIN
1"AIR GAP
Connect the drain hose to wall or floor drain. The 
floor drain must have a 1 inch air gap between
drain hose and floor drain.
WALL
DRAIN
WARNING
: Electrical and
plumbing connections need
to be made by a qualified
service person who will
comply with all available
Federal, State and Local
Health, Electrical,
Plumbing and Safety
codes.
5
STEP
5
5
800-854-6417
Adjust pressure regulator located behind side panel,
to 20 psi (maximum).
8
STEP
Turn power switch to "ON" position. Hold down 
"FILL" switch until water overflows into the scrap
drawer.
9
STEP
After filling dishwasher for the first time, 
(CAUTION: 
turn power supply off) reconnect the factory 
unplugged wire to booster high-limit switch located
behind front panel.
180UC FRONT VIEW
WASH TEMP 150 -160  
FINAL RINSE TEMP 180 -195
 
POWER
OFF
DRAIN
START
CYCLE
FILL
ON
RINSE
TEMPERATURE 
DISPLAY
POWER
SCRAP 
DRAWER
WASH
TEMPERATURE 
DISPLAY
RINSE 
PRESSURE 
GAUGE
START
6
STEP
Chemical dispenser electrical hookup is located
inside control box. Chemical dispenser is optional.
It is not sold with dishmachine.
RINSE
DETERGENT
ELECTRICAL 
BLOCK
6
DRAIN FILL
8
BOOSTER
HIGH LIMIT
SWITCH
9
FILL
3-2007
7
STEP
20
PRESSURE 
REGULATOR
(Located behind
side panel)
7
180UC 
Quick Setup 
Instructions
WARNING
: Electrical and
plumbing connections need
to be made by a qualified
service person who will
comply with all available
Federal, State and Local
Health, Electrical, Plumbing
and Safety codes.
800-854-6417