Intel MFS5520VI User Manual

Page of 56
Intel® Compute Module MFS5520VI TPS  
Jumper Block Settings 
Revision 1.3 
 
33 
Intel order number: E64311-005 
4.  Move jumper from the default operating position (pins 1-2) to the “Enabled” position (pins 
2-3) 
5.  Close the compute module. 
6.  Reinstall and power up the compute module. 
7.  Perform Integrated BMC firmware update procedure.  
8.  Power down the compute module. 
9.  Remove the compute module from the server system. 
10. Move jumper from the “Enabled” position (pins 2-3) to the “Disabled” position (pins 1-2). 
11. Close the compute module. 
12. Reinstall the compute module into the modular server chassis. 
13. Power up the compute module. 
Note: Normal Integrated BMC functionality (for example, KVM, monitoring, and remote media) 
is disabled with the force BMC update jumper set to the “Enabled” position. The server should 
never be run with the BMC force update jumper set in this position and should only be used 
when the standard firmware update process fails. This jumper should remain in the default – 
disabled position when the server is running normally.  
5.1.3 
Integrated BMC Initialization 
When the DC power is first applied to the compute module by installing it into a chassis, 5V-
STBY is present, the Integrated BMC on the compute module requires 15-30 seconds to 
initialize. During this time, the power button functionality of the control panel is disabled, 
preventing the compute module from powering up.