Netgear M5300-52G-POE+ (GSM7252PSv1h2) - ProSAFE 48+4 L2+ POE Stackable Managed Switch Administrator's Guide

Page of 721
Port Routing 
106
Managed Switches 
CLI: Enable Routing for Ports on the Switch
(Netgear Switch) #config
(Netgear Switch) (Config)#interface 1/0/2 
(Netgear Switch) (Interface 1/0/2)#routing 
(Netgear Switch) (Interface 1/0/2)#ip address 192.150.2.1 255.255.255.0
(Netgear Switch) (Interface 1/0/2)#exit
(Netgear Switch) (Config)#interface 1/0/3
(Netgear Switch) (Interface 1/0/3)#routing
(Netgear Switch) (Interface 1/0/3)#ip address 192.150.3.1 255.255.255.0
(Netgear Switch) (Interface 1/0/3)#exit
(Netgear Switch) (Config)#interface 1/0/5 
(Netgear Switch) (Interface 1/0/5)#routing
(Netgear Switch) (Interface 1/0/5)#ip address 192.150.5.1 255.255.255.0
(Netgear Switch) (Interface 1/0/5)#exit
(Netgear Switch) (Config)#exit
Web Interface: Enable Routing for Ports on the Switch
1. 
Assign IP address 192.150.2.1/24 to interface 1/0/2.
a. Select Routing > IP > Advanced > IP Interface Configuration
A screen similar to the following displays.
b.  Scroll down and select the interface 1/0/2 check box. 
Now 1/0/2 appears in the Interface field at the top.
c.  Under the IP Interface Configuration, enter the following information:
In the IP Address field, enter 192.150.2.1.
In the Subnet Mask field, enter 255.255.255.0.