Netgear GS728TPP – 28PT GE POE+ SMART SWITCH Hardware Manual
22
GS752TP, GS728TP, and GS728TPP Gigabit Smart Switch
Step 1: Prepare the Site
Before you install the switch, ensure that the operating environment meets the site requirements
in the following table.
in the following table.
Characteristics
Requirements
Mounting
•
Desktop installations. Provide a flat table or shelf surface.
•
Rack-mount installations. Use a 19-inch (48.3-centimeter) EIA standard equipment rack
that is grounded and physically secure. The rack-mount kit supplied with the switch is also
required.
that is grounded and physically secure. The rack-mount kit supplied with the switch is also
required.
Access
Locate the switch in a position that allows you to access the front panel RJ-45 ports, view the
front panel LEDs, and access the power connector.
front panel LEDs, and access the power connector.
Power source
Provide a power connection cord. Power specifications for the switch are shown in
. Ensure that the AC outlet is not controlled by a wall switch, which can
accidentally turn off power to the outlet and the switch.
Environmental
•
Temperature. Install the switch in a dry area, with ambient temperature between 0ºC and
40ºC (32ºF and 104ºF). Keep the switch away from heat sources such as direct sunlight,
warm air exhausts, hot-air vents, and heaters.
40ºC (32ºF and 104ºF). Keep the switch away from heat sources such as direct sunlight,
warm air exhausts, hot-air vents, and heaters.
•
Operating humidity. The installation location should have a maximum relative humidity of
90%, non-condensing.
90%, non-condensing.
•
Ventilation. Do not restrict airflow by covering or obstructing air inlets on the sides of the
switch. Keep at least 2 inches (5.08 centimeters) free on all sides for cooling. Be sure that
there is adequate airflow in the room or wiring closet where the switch is installed.
switch. Keep at least 2 inches (5.08 centimeters) free on all sides for cooling. Be sure that
there is adequate airflow in the room or wiring closet where the switch is installed.
•
Operating conditions. Keep the switch at least 6 feet. (1.83 meters) away from nearest
source of electromagnetic noise, such as a photocopy machine.
source of electromagnetic noise, such as a photocopy machine.
Step 2: Install the Switch
The GS752TP, GS728TP, and GS728TPP Gigabit Smart Switch can be used on a flat
surface or mounted in a standard network equipment rack.
surface or mounted in a standard network equipment rack.
Install the Switch on a Flat Surface
The switch ships with four self-adhesive rubber footpads. Stick one rubber footpad on each of
the four concave spaces on the bottom of the switch. The rubber footpads cushion the switch
against shock and vibrations.
the four concave spaces on the bottom of the switch. The rubber footpads cushion the switch
against shock and vibrations.
Install the Switch in a Rack
To install the switch in a rack, you need the 19-inch rack-mount kit supplied with the switch.
1.
Attach the supplied mounting brackets to the side of the switch.
2.
Insert the screws provided in the rack-mount kit through each bracket and into the bracket
mounting holes in the switch.
mounting holes in the switch.