Netgear M5300-28G (GSM7228S) - ProSAFE 24-port Gigabit L2+ Managed Stackable Switch Hardware Manual

Page of 32
Hardware Installation
14
NETGEAR Managed Stackable Switch M5300 Series 
Check the Installation
Before you apply power, perform the following checks:
1. 
Inspect the equipment thoroughly.
2. 
Verify that all cables are installed correctly.
3. 
Check cable routing to ensure that cables are not damaged and do not create a safety 
hazard.
4. 
Be sure that all equipment is mounted properly and securely.
Connect to Power and Check the LEDs
The switch does not have an On/Off switch. The only way to apply or remove power is to 
connect or disconnect the power cord. Before you connect the power cord, select an AC 
outlet that is not controlled by a wall switch (which can turn off power to the switch). 
After you select an appropriate outlet, follow these steps to apply AC power:
1. 
Connect one end of the AC power adapter cable to the rear of the switch, and the other 
end to a grounded three-prong AC outlet.
2. 
Check the Power LED on the front panel of the switch. The LED lights up in the following 
sequence:
•     
The LED turns yellow as the switch runs a power-on self-test (POST). 
•     
If the switch passes the test, the LED turns green. The switch is working and ready to 
pass data. 
•     
If the POST fails, the Power LED blinks yellow. 
If the Power LED does not light up, check that the power cable is plugged in correctly and 
that the power source is good. For help with troubleshooting, see 
22.”
SFP+ and SFP Modules
SFP+ and SFP modules (sold separately) can be inserted directly into the switch ports.
Figure 4. SFP+ SFP Modules