KitchenAid 20.4 cu. ft. 36" Width Right-Hand Door Swing Installation Guide

Page of 68
17
Connect the Water Supply
Read all directions before you begin.
IMPORTANT: If you turn the refrigerator on before the water line is 
connected, turn the ice maker OFF.
Style 1 - Shutoff Valve Connection
NOTE: If your water line connection does not look like Style 1, see 
“Style 2 - Copper Line Connection.”
1. Unplug refrigerator or disconnect power supply.
IMPORTANT: Before attaching the tubing to shutoff valve, flush 
the main water supply line to remove particles and air in the water 
line. Allow enough flow so that water becomes clear. Flushing the 
water line may help avoid filters and/or water valves from 
becoming clogged.
2. Remove the shipping tape from the gray, coiled water tubing 
on the rear of the refrigerator.
3. Thread the provided nut onto the shutoff valve as shown.
4. Turn shutoff valve ON.
5. Check for leaks. Tighten any nuts or connections (including 
connections at the valve) that leak.
6. Plug in the refrigerator or reconnect power.
7. Flush the water system. See “Water System Preparation.”
NOTE: Allow 24 hours to produce the first batch of ice. Discard 
the first three batches of ice produced. Allow 3 days to completely 
fill ice container.
Style 2 - Copper Line Connection
Connecting to Water Line
NOTE: If existing water line meets the “Water System 
Requirements,” see “Connecting to Refrigerator.”
1. Unplug refrigerator or disconnect power.
2. Turn OFF main water supply. Turn ON nearest faucet long 
enough to clear line of water.
3. Locate a ½" to 1
¹⁄₄" (1.25 cm to 3.18 cm) vertical cold water 
pipe near the refrigerator.
IMPORTANT: 
Make sure it is a cold water pipe.
Horizontal pipe will work, but drill on the top side of the 
pipe, not the bottom. This will help keep water away from 
the drill and normal sediment from collecting in the valve.
4. Determine the length of copper tubing you need. Measure 
from the connection on the lower left rear of refrigerator to the 
water pipe. Add 7 ft (2.1 m) to allow for cleaning. Use 
¹⁄₄" 
(6.35 mm) O.D. (outside diameter) copper tubing. Be sure both 
ends of copper tubing are cut square. 
5. Using a grounded drill, drill a 
¹⁄₄" (6.35 mm) hole in the cold 
water pipe you have selected.
6. Fasten the shutoff valve to the cold water pipe with the pipe 
clamp. Be sure the outlet end is solidly in the 
¹⁄₄" (6.35 mm) 
drilled hole in the water pipe and that the washer is under the 
pipe clamp. Tighten the packing nut. Tighten the pipe clamp 
screws slowly and evenly so washer makes a watertight seal. 
Do not overtighten, or you may crush the copper tubing. 
7. Slip the compression sleeve and compression nut on the 
copper tubing as shown. Insert the end of the tubing into the 
outlet end squarely as far as it will go. Screw compression nut 
onto outlet end with adjustable wrench. Do not overtighten the 
clamp or the sleeve. This will crush the copper tubing.
IMPORTANT: Before attaching the tubing to shutoff valve, flush 
the main water supply line to remove particles and air in the water 
line. Allow enough flow so that water becomes clear. Flushing the 
water line may help avoid filters and/or water valves from 
becoming clogged.
8. Turn off the shutoff valve on the water pipe. Coil the copper 
tubing.
9. Check for leaks around the saddle valve.
Connecting to Refrigerator
1. Unplug the refrigerator or disconnect power.
2. Remove the shipping tape from the gray, coiled water tubing 
on the rear of the refrigerator. 
3. Measure the distance from the shutoff valve to the opening in 
which the refrigerator will be located. Tubing must be 
extended from the shutoff valve into the refrigerator opening 
following specific guidelines. See “Water Supply 
Requirements.”
4. 
¹⁄₄" x ¹⁄₄" (6.35 mm to 6.35 mm) coupling is needed in order 
to connect the water tubing to an existing household water 
line. Thread the provided nut onto the coupling on the end of 
the copper tubing. 
5. Turn shutoff valve ON.
6. Check for leaks. Tighten any nuts or connections (including 
connections at the valve) that leak.
7. Plug in the refrigerator or reconnect power.
8. Flush the water system. See “Water System Preparation.”
A. Bulb
B. Nut
C. Water tubing
A
B
C
A. Cold water pipe
B. Pipe clamp
C. Copper tubing
D. Compression nut
E. Compression sleeve
F. Shutoff valve
G. Packing nut
A. Water tubing
B. Nut
C. Bulb
D. Coupling (purchased)
E. Ferrule (purchased)
F. Nut (purchased)
G. Household water line (as 
connected in previous section)
A
B
C
D
E
F
G
A
B
C
D
E
F
G