Zanussi ZHC900X User Manual
EN
1
3
INSTALLATION
Wall drilling and bracket À[LQJ
Wall marking:
Draw a vertical line on the supporting wall up to the ceiling, or as high as practical, at the
centre of the area in which the hood will be installed.
Draw a horizontal line at 650 mm above the hob for installation without the back panel, or at
height H (H=height of the visible part of the panel) for installation with the back panel.
Place bracket 7.2.1 on the wall as shown about
1 mm to 2 mm
from the ceiling or upper limit
aligning the centre (notch) with the vertical reference line.
Mark the wall at the centres of the holes in the bracket.
Place bracket 7.2.1
Place bracket 7.2.1
second bracket on the wall as shown at X mm below the ¿Ust bracket (X =
height of the upper chimney section supplied), aligning the centre (notch) with the vertical line.
Mark the wall at the centres of the holes in the bracket.
Place bracket 7.1 as shown 95 mm from the vertical reference line and 210 mm above the
Place bracket 7.1 as shown 95 mm from the vertical reference line and 210 mm above the
horizontal reference line.
Mark the centres of the holes in the bracket.
Repeat this operation on the other side.
Repeat this operation on the other side.
REAR PANEL (OPTIONAL)
The Rear Panel must be ¿WWHd before ¿xing th e hood body and, if it is to be ¿xed at both top
and bottom, must be ¿tted at the correct height prior to installing the bases. As this operation is
rather complex, it should be carried out either by the kitchen installer or a TXDOL¿HG person
who knows the ¿nal dimensions of the units.
For ¿[LQJ at the top only, proceed as follows:
Rest the back panel on the base, inserting the lower plate between the upper surface and the
and bottom, must be ¿tted at the correct height prior to installing the bases. As this operation is
rather complex, it should be carried out either by the kitchen installer or a TXDOL¿HG person
who knows the ¿nal dimensions of the units.
For ¿[LQJ at the top only, proceed as follows:
Rest the back panel on the base, inserting the lower plate between the upper surface and the
wall, centring it on the vertical reference line.
Mark the centres of the two holes in the upper plate.
Drill ø 8 mm holes at all the centre points marked.
Insert the wall plugs 11 in the holes.
Fix the brackets using the 12a screws (4,2 x 44,4) supplied.
Fix the back panel (where present) using the 12a (4,2 x 44,4) screws supplied.
Drill ø 8 mm holes at all the centre points marked.
Insert the wall plugs 11 in the holes.
Fix the brackets using the 12a screws (4,2 x 44,4) supplied.
Fix the back panel (where present) using the 12a (4,2 x 44,4) screws supplied.
1 ~ 2