APC galaxy 9000 User Manual

Page of 40
34006451EN/AC
 - Page 18
Installation
Internal connections between cubicles  
– removal of inverter leg no.6 is recommended prior to bolting fish-plates L+ and L-;
– first remove the two fuses and the two cables connected to the leg;
– then pull the leg out;
– bolt fish-plates L+ and L-;
– refit inverter leg no 6;
– intended only for transportation, the front gussets do not need to be refitted;
– bolt cables L1, L2, L3 and N (4 x 2) coming from the left cubicle to the bars in the right cubicle (see figure opposite);
– connect the earth strap to the front uprights of both cubicles;
– connect the connectors marked XF286 to XF2810 on the five ribbon cables coming from the right cubicle to connectors 
XM286 to XM2810 respectively on the interface board located on the right side of the left cubicle;
– connect the connectors marked XFGD01 to XFGD05 (XFGD01 to XFGD05 and XMGD06 for parallel UPSs) on the control 
wires coming from the left cubicle to connectors XMGD01 to XMGD05 (XMGD01 to XMGD05 and XFGD06 for 
parallel UPSs).
interface board
XM286 to XM2810
L
L+
N   L1   L2   L3
XMGD05
XMGD01 to XMGD04
XFGD06
inverter
 leg no. 6
fuses and cables
to be disconnected
fish-plates
to be
bolted
cables to be
connected
left cubicle
right cubicle
earth strap to be
connected to the front
uprights of both cubicles