ACS 255 User Manual

Page of 63
Preventative Maintenance Checklist   
                              
 
 
Dehumidifying Dryer Systems
 
 
System model # 
 
Serial # 
Every week 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Inspect all filters for 
wear, replace/clean 
if dirty or worn. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Every month 
Jan  Feb  Mar  Apr  May  Jun 
Jul  Aug  Sep  Oct  Nov  Dec 
Lock out electrical 
power and inspect 
electrical wiring for 
integrity. 
 
 
 
 
 
 
 
 
 
 
 
 
Lock out electrical 
power and check 
heater elements for 
continuity using an 
ohmmeter. 
 
 
 
 
 
 
 
 
 
 
 
 
Check dew point 
and temperature 
tracking with an 
external dew point 
monitor and 
pyrometer. 
 
 
 
 
 
 
 
 
 
 
 
 
Visually inspect the 
shifting of the airflow 
valve during one 
cycle. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Every year 
Next scheduled 
inspection 
Actual inspection 
Date/By 
Next scheduled 
inspection 
Actual inspection 
Date/By
 
Inspect desiccant. Replace 
if brown or broken.
 
 
 
 
 
 
Every two years 
Scheduled  
replacement date 
Actual replacement 
Date/Work done by 
Scheduled 
replacement date 
Actual replacement 
Date/Work done by
 
Replace desiccant. 
 
 
 
 
 
-  Photocopy this page for your maintenance records – 
 
 
 
 
 
Operation 
51