Monessen Hearth BUF500 User Manual

Page of 20
14 
61D1013
OPTIONAL EqUIPMENT 
FORCED AIR KIT (FA2A)
If you are installing the forced air kit, Model FA2A, see the installation instructions provided with the kit for electri-
cal wiring requirements, or the blower installation section.  The firebox must be connected to main power supply 
at time of firebox installation. The blower must be installed prior to the installation of the vent-free heater. The 
electrical connections must be made before the firebox is framed and enclosed in the finished walls.
Electrical connections should only be performed by a qualified, licensed electrician, 
main power must be off when connecting to main electrical power supply or performing 
service.
The blower when installed, must be electrically grounded in accordance with local codes 
or in the absence of local codes, with the National Electrical Code ANSI/NFPA 70.
W
ARNING