GE zv881wss User Manual

Page of 16
10
Installation
Professional Vent Hoods
• Drill 3/16" pilot holes through the shims and
into the soffit studs.
• Hold the hood against the soffit and secure
with 6 lag screws with washers.
• For additional support and to minimize
vibration during operation, we recommend
that the hood be secured to the back wall.
• Drive lag screws through the rear panel of
the hood and into the wall studs.
4
Step
Install Hood
Below Soffit
INSTALLATION
UNDER A SOFFIT
(SKIP THIS STEP
IF SOFFIT IS NOT
USED.)
SOFFIT INSTALLATION
ZV681YSS, ZV680YSS
4-1/2"
6-1/4"
5-3/4"
4-1/2"
6-1/8"
8-1/4"
6-1/4"
6-1/8"
8-1/4"
3-1/2"
3-1/2"
2-1/4"
2-3/4"
35"
4-1/2"
12"
Junction
Box
48" Hood Top View - Front Side
Back Side
ZV671WSS, ZV670WSS
ZV881WSS, ZV880WSS
ZV891YSS, ZV890YSS
ZV371YSS, ZV370YSS
8-1/2"
5-1/2"
14-7/16"
12"
Junction
Box
36" Hood Top View - Front Side
7"
35-7/8"
Back Side
14-7/16"
4-1/4"
3/4"
3"
3"
2-7/8"
3-1/8"
5-1/2"
12-7/16"
12-7/16"
10-15/16"
5-1/8"
5-7/8"
4-1/2"
6-1/8"
14-11/16"
6-1/4"
6-1/8"
14-11/16"
3-1/2"
3-1/2"
2-1/4"
2-3/4"
47-7/8"
12"
Junction
Box
48" Hood Top View - Front Side
Back Side
10-15/16"
5-1/2"
5-1/2"
11-7/16"
12"
Junction
Box
30" Hood Top View - Front Side
7"
29-7/8"
Back Side
11-7/16"
4-1/4"
3/4"
3"
3"
2-7/8"
3-1/8"
2-1/2"
12-7/16"
12-7/16"
4"
6-1/4"
8"
12"
Junction
Box
36" Hood Top View - Front Side
7"
23"
Back Side
8"
4-1/4"
3/4"
3"
3"
2-7/8"
3-1/8"
1"
10-1/2"
10-1/2"