Havis-Shields c-tcb-9 User Manual
INSTALL INSTRUCTIONS C-TCB-9
1989-2001 JEEP CHEROKEE
TOOLS REQUIRED:
3/16” Allen wrench
3/8” Standard socket set
3/8” Metric socket set
3/8” Standard socket set
3/8” Metric socket set
Ratcheting wrench (3/8” drive)
Powered drill w/ 3/16” drill bit
Open-end wrench set
Powered drill w/ 3/16” drill bit
Open-end wrench set
HARDWARE & COMPONENTS:
QTY DESCRIPTION PART
#
1
Pole support assembly
CM93071-9
1
Telescoping pole assembly
CM93072-3
1
Side support brace
CM93146
1
5/16” Flat washer
GSM31006
1
5/16-18 Nylock nut
GSM30017
2
¼” x ¾”Hex head lag bolt
GSM33060-1
Always
!
Read all instructions before installing any Havis-Shields Equipment Corp products.
Check for obstructions (Wire, brake lines, fuel tank, etc.) before drilling any holes!
Use hardware provided with install kit
Check for obstructions (Wire, brake lines, fuel tank, etc.) before drilling any holes!
Use hardware provided with install kit
¼” x ¾”Hex
head lag bolts
5/16-18
Nylock nut
Side support
brace
Telescoping pole
assembly
Pole support
assembly
Location of
passenger side factory
seat base bolts