Hobart legacy ml-134334 User Manual

Page of 28
– 5 –
INSTALLATION
UNPACKING
Immediately after unpacking the mixer, check for possible shipping damage. If this machine is found 
to be damaged after unpacking, save the packaging material and contact the carrier within 15 days of 
delivery.
LOCATION
Prior to installation, test the electrical service to assure that it agrees with the specifi cations on the machine 
data plate.
Place the mixer in its operating location. There should be adequate space around the mixer for the user 
to operate the controls and to install and remove bowls. The area above and to the right side of the mixer 
should allow the top and side covers to be removed for routine maintenance and servicing.
 Once in position, the mixer must be leveled:
 
•  Remove the two top cover screws and the top cover.
 
•  Place a level on the top rim of the large pulley (Fig. 1). Slide shims under the base contact surface 
of the mixer as required to level it front-to-back and side-to-side.
 
•  Do not replace the top cover until installation is completed.
Fig. 1