Trendnet TEG240WS User Manual

Page of 75
 
UNPACKING AND INSTALLATION 
This chapter provides unpacking and installation information for the 
Switch. 
Unpacking 
Open the shipping cartons of the Switch and carefully unpacks its 
contents.    The carton should contain the following items: 
‹ 
TEG-240WS 24-Port Gigabit Web Smart Switch w/ 2 Shared 
Mini-GBIC Slots 
‹ 
Multi-Language Quick Installation Guide 
‹ 
CD-COM (Utility & User’s Guide) 
‹ 
Power Cord 
‹ 
Rack Mount Kit (Rubber Feet, Screws and Mounting Brackets) 
If any item is found missing or damaged, please contact your local 
reseller for replacement 
Installation 
The site where you install the hub stack may greatly affect its 
performance. When installing, consider the following pointers: 
Install the Switch in a fairly cool and dry place.  See Technical 
Specifications
 for the acceptable temperature and humidity operating 
ranges. 
Install the Switch in a site free from strong electromagnetic field 
generators (such as motors), vibration, dust, and direct exposure to 
sunlight. 
Leave at least 10cm of space at the front and rear of the hub for 
ventilation.