TP-LINK CPE510 User Manual

Page of 77
Pharos Control User Guide
 
44 
5.1  Task Classification 
Task Classification is in Section A of the Task Tab
 
Figure 5-2 Task Classification 
Tasks are categorized into four groups: Scheduled, Running, Completed and Failed. 
These four categories cannot be edited or deleted. Click the corresponding folder to view its tasks. 
Entry Introduction: 
  Scheduled: The scheduled tasks which are not executed yet. 
  Running: The running tasks.   
  Completed: The completed tasks. 
  Failed: The failed tasks. 
Operations: 
 
Maximize the current window.