TP-LINK CPE510 User Manual
Pharos Control User Guide
44
5.1 Task Classification
Task Classification is in Section A of the Task Tab.
Figure 5-2 Task Classification
Tasks are categorized into four groups: Scheduled, Running, Completed and Failed.
These four categories cannot be edited or deleted. Click the corresponding folder to view its tasks.
Entry Introduction:
Scheduled: The scheduled tasks which are not executed yet.
Running: The running tasks.
Completed: The completed tasks.
Failed: The failed tasks.
Operations:
Maximize the current window.