Westinghouse CONTRACTOR SERIES 10KPRO Owner's Manual

Page of 106
16 
ASSEMBLY
6. 
Install the lifting bracket using the hex bolts, 
spacers and locknuts
 (see Figure 8)
1
2
3
4
Figure 8 – Installing Lifting Bracket
1 -   Lifting Bracket
2 -  Hex Bolt
3 -  Spacer Sleeve
4 -  Locknut
INSTALLING THE BATTERY
!
 WARNING
To avoid electric shock:
•  
ALWAYS connect the positive (+) 
battery cable (red boot) first when 
connecting battery cables.
•  
ALWAYS disconnect the negative (-) 
battery cable (black boot) first when 
disconnecting battery cables.
•  
NEVER connect the negative (-) 
battery cable (black boot) to the 
positive (+) post on the battery.
•  
NEVER connect the positive (+) 
battery cable (red boot) to the 
negative (-) post on the battery.
•  
NEVER touch both battery posts 
simultaneously.
•  
NEVER place a metal tool across 
both battery posts.
•  
ALWAYS use insulated or non-
conducting tools when installing the 
battery.
OTE:
N
The generator comes equipped with the 
positive battery cable (red boot) already 
attached.
1.  Verify the positive (+) battery cable (red boot) is 
securely tightened to the positive (+) battery post. 
Make sure boot is over battery post.
2.  Carefully remove the protective wrapping around 
the lug of the negative (-) battery cable (black boot). 
3.  Locate negative (-) cable attached to alternator 
cable, remove tie and route to the negative (-) 
battery post.