Bunn FPG Owner's Manual
4
ELECTRICAL REQUIREMENTS
The grinder has an attached cordset and requires 2-wire, grounded service rated 120 volts ac, 15 amp, single
phase, 60 Hz for 120V models; and 100 volts ac, 15 amp single phase, 50Hz for 100V models.
P2947
P2947
OPERATING CONTROLS
Off/On/Start Switch
OFF - (upper position) Switching to this position stops all operation of
the grinder.
ON - (middle position) The switch will return to this position after a
grind cycle has begun and will remain in this position after grinding has
ceased.
START - (lower, momentary position) Pressing the switch to this position
and releasing initiates a grind cycle.
Batch Selector Switch
Select Small, Medium or Large batch by turning the round selector knob
on the left front of the grinder.
36783 042211