Bunn FPG Owner's Manual

Page of 6
4
ELECTRICAL REQUIREMENTS
 
The grinder has an attached cordset and requires 2-wire, grounded service rated 120 volts ac, 15  amp, single 
phase, 60 Hz for 120V models; and 100 volts ac, 15 amp single phase, 50Hz for 100V models.
P2947
P2947
OPERATING CONTROLS
Off/On/Start Switch
 
OFF - (upper position) Switching to this position stops all operation of 
the grinder.
 
ON  - (middle position) The switch will return to this position after a 
grind cycle has begun and will remain in this position after grinding has 
ceased.
 
START - (lower, momentary position) Pressing the switch to this position 
and releasing initiates a grind cycle.
Batch Selector Switch
 
Select Small, Medium or Large batch by turning the round selector knob 
on the left front of the grinder.
36783 042211