GOLD CGi Gas-Fired Water Boiler — Boiler Manual
  Inspect . . .
Burners and base
The  boiler  contains  ceramic  fiber
and  fiberglass  materials.  Use  care
when handling these materials per
instructions  on
page  68
 of  this
manual.  Failure  to  comply  could
result in severe personal injury.
If insulation is damaged or displaced,
do  not  operate  the  boiler.  Replace
or  reposition  insulation  as  neces-
sary.  Failure  to  replace  damaged
insulation can result in a fire hazard,
causing severe personal injury, death
or substantial property damage.
1.  After turning off power to the boiler, remove the base
burner shield (
Figure 40
, item
4
, page 60).
.  Inspect burners and all other components in the boiler
base.
3.  If  burners  must  be  cleaned  see
Burner  cleaning  in-
structions
below.
4.  Inspect the slotted jacket cooling openings in the bot-
tom left and right of the base pan (
Figure 40
, item
7
,
page 60).
5.  Inspect the base insulation. Pay attention to the
WARN-
ING 
on  page  68  regarding  working  with  insulation
materials. Verify that the insulation is intact and secure
against all four sides of the base.
Burner cleaning instructions
Airborne  materials,  such  as  fiberglass
and dust, are present during construc-
tion  and  remodeling.  These  materials
can be drawn in with the combustion
air and obstruct burner ports, resulting
in carbon monoxide production, a fire
hazard, or building freeze damage. Read
and  follow  the
WARNING
 on  page 9.
Failure to inspect and clear gas burner
ports  could  result  in  severe  personal
injury,  death  or  substantial  property
damage.
1.  Remove burner shield and the base pan air baffle. Next
remove the pilot bracket assembly. Then remove the
four screws securing the burner tray to the manifold
and slide the burner tray out under the manifold.
.  Inspect each burner to insure that every port is com-
pletely open.
3.  If any port is not completely clear, run a vacuum at the
burner inlet while cleaning the burner ports with a wire brush. The
vacuum will help to draw any airborne material out of the burner.
4.  Reinstall components, starting with the burner tray, then the pilot
bracket assembly, burner baffle, and air inlet top and front panels.
5.  Follow the start-up procedure in the boiler manual.
Condensate drain system
1.  Inspect condensate drain fittings and tubing. Verify that condensate
can flow freely to drain.
  Service . . .
Inducer motor
1.  With boiler power
off
, place a few drops of S.A.E. 0 motor oil in
each of the two oil cups.
Use only
S.A.E. 20 motor oil
to lubricate the inducer
motor.  Do  not  use  universal  household  oils.  Mo-
tor could be damaged, resulting in possible severe
property damage.
Oiled-bearing circulators
1.  The circulator shipped with the CGi boiler is water-lubricated. No
oiling is required.
.  Check other circulators in the system. Oil any circulators requiring
oil,  following  circulator  manufacturer’s  instructions.  Over-oiling
will damage the circulator.
  Start-up . . .
1.  Perform all start-up procedures in Section
7
of this manual.
.  Verify
cold fill pressure
is correct and that fill system is working
properly.
3.  Verify
antifreeze level
(if used) is at the right concentration and
that inhibitor level is correct.
4.
Check  gas  piping
 per  manual  Sections
5
 and
7a
,  verifying  no
indications of leakage and all piping and connections are in good
condition.
5.  Read the appropriate
Operating instructions
(Section
9c
of this
manual or on boiler label) applying to the boiler.
6.  Start the boiler following the appropriate
Operating instructions 
(Section
9c
of this manual or on boiler label).
10b
Service & maintenance – annual start-up 
(cont.)