Sprint Nextel SP-809 User Manual

Page of 52
14
Preparation
CHARGING A SPARE BATTERY PACK
You can also charge and store a spare battery pack in the base. 
The spare battery pack fully charges in 15 hours.
1
Press the tab on the 
spare battery pack compart-
ment and lift off the cover.
2
Place the battery pack in 
the compartment as indicated 
by the polarity symbols (+ and 
–) marked inside. The SPARE 
BATT/CHARGING indicator 
on the base lights.
3
Replace the cover.
Preparation
SETTING THE DIALING MODE
Set the dialing mode for the type of service you have. If you are not 
sure which type you have, once the handset’s battery pack is fully 
charged, do this test.
1
Lift the handset, then 
press 
PHONE 
and listen for 
the dial tone.
2
Press any number other than 
0
.
Note: If your phone system requires that you dial an access 
code (9, for example) before you dial an outside number, do not 
press the access code either.
Tab
SPARE BATT/
CHARGING
Indicator
PHONE
43-5809.fm  Page 14  Wednesday, August 18, 1999  1:43 PM