Faber Genie M1024 User Manual

Page of 127
28    Installing the Genie Camera 
Genie Monochrome Series-GigE Vision Camera 
 
 
•  The firmware update is complete when the lower message output area says "Device reset complete". Close the 
Device Manager program. 
•  Genie cameras manufactured in 2007 or later will display the following status LED sequence while initializing 
with the new firmware.  
•  Status LED will flash red then go off.  
•  Both LAN LEDs will flash repeatedly for a short time. 
•  Status LED will flash red then go off again.  
•  Both LAN LEDs will flash repeatedly for a short time again. 
•  Status LED will turn blue as normally happens during power up. 
•  Wait for the GigE Server to find the Genie again, then run CamExpert to test the Genie operation (as described 
below).  
 
 
Important: If the Genie power is accidentally cut off during the firmware update (such as a electrical source 
power failure or human error), the Genie is easily recovered. See 
"
" on page 107