SharkRack Enclosure Installation Guide 
ID-00210-000 
REV D, ECO2773 
Page 12 of 46 
 
Unpacking Instructions- Integration Packaging 
 
Step Detail 
 
 
WARNING: A fully loaded cabinet is very 
heavy. Take proper precautions when moving 
the cabinet  
 
Note: Unpacking of a cabinet requires at least two 
people.  
 
There must be at least 13 feet of clear area in front of 
the loaded crate to unload the cabinet. 
1. Open the Crate.  Loosen the (6) clips securing the 
front of the crate. The front of the crate is used as a 
ramp to unload the cabinet.   
 
 
Figure 9 
Shipping Crate Shown for 42U X 37DP Cabinet 
2. Position the loading ramp onto the front of the crate.   
3. Remove the (2) wing nuts securing the piece of wood 
at the base of the cabinet. 
4. Remove the (4) bolts securing the front Floor 
Mounting Bracket to the crate and cabinet.  
 
 
Figure 10 
Shipping Crate with 42U X 37DP Cabinet Shown 
#3
#4