PBs siPs tips
•  Project must meet local code.
•  Confirm your installation date at least two 
weeks prior to requesting on-site assistance.
•  Schedule a preconstruction meeting with 
your installation crew (concrete, plumbing, 
electrical, siding, roofing, etc.).
•  Inventory materials when you receive them.
•  Check all SIPs for proper cuts and recesses.
•  Double check SIPs sizes and compare to 
shop drawings before installation.
•  Engineered details take prescedence over  
PBS details.
•  PBS details regarding mastic and SIPs tape 
need to be followed.
•  Any changes required at the job site should 
be communicated with the technical 
representative.
•  Make sure your foundation or floor is level 
and square.
•  Fabricate and pre-install dimensional or I-joist 
spline material as specified.
•  Review engineering for hold downs if 
applicable.