Test-Um VALIDATOR-NT NT955 User Manual

Page of 97
27
Test-Um NT955 Series
Operations
The Validator-NT main unit is powered on by pressing the red power 
button.  When powering on, the unit will display a series of start up 
screens until the Start screen is reached, which contains the main menu.  
At the top of every screen the following information appears - The name 
of the screen being displayed “Start, Auto Test” etc., the current job 
name, the battery condition and the date/time from the internal clock. 
The Validator-NT always has a file open, which is the current file name 
that appears at the top of the screen, so that data can be saved in 
the event of auto-power down.  The last job opened will remain as the 
current job until changed even through on and off cycles.
The Start screen has five buttons: 
Auto TestManual TestsNetwork 
Tests, Job ManagerSetup and Properties.  You can navigate between 
these buttons with the arrow keys that move from left to right on each 
row.
Auto Test
Selecting this button takes you to a menu of five functions used to work 
with existing jobs or create new jobs and test cables.  Test Results are 
automatically saved and can be downloaded to Plan-Um to document 
and archive the job.
Cable Test Schedule: Tests cables from a predefined job file or define-
as-you-go Cable Schedule using Pass/Fail criteria. 
Site Information and Contractor Information: View, edit or create this 
job information.  
Custom Cable Definitions:  View existing cable definitions and create 
or edit custom cables. 
 
Job Utilities: File utilities used to create or manipulate job files.
Manual Tests
Select this button to test data, phone, or 2 wire cables without defining 
the job, cable name or type.  The specified test is run and the raw results 
displayed without pass or fail criteria being applied. Manual tests cannot 
be saved as Auto Tests can.
Validator
TM
 Operations
Validator
TM
 Operations