Test-Um VALIDATOR-NT NT955 User Manual

Page of 97
35
Test-Um NT955 Series
1.6. Calibrate 
The calibration procedure is performed to set a reference point for cable 
length to 0 feet/meters.  Once calibration is performed, the test unit 
retains the information. The Validator-NT does not require any other 
calibration. (Figure 1.7)
Note:  Please disconnect all Patch Cables
Calibrate
Untitled1.job
Continue
To calibrate the unit make sure there are no
cables plugged into the unit. (Unless a patch
cord is being used)
Test-Um Inc.
validator
100%
2005 Aug 25
  10:53:01
Figure 1.7 Calibrating The Unit
Validator
TM
 Setting Up the Test Tool
Validator
TM
 Setting Up the Test Tool