Horizontal Termination
„
The horizontal termination cap must maintain a
3” clearance to any overhead combustible
projections that are 2 1/2” or less.  It must also
maintain a 12” clearance from projections that
exceed 2 1/2”.  See Figure 9.
„
 Minimum vertical rise from the top exit position
is a 24” section vent pipe. See Fig. 10.
„
A horizontal vent run made directly off the rear
of the stove must terminate ONLY with a 36”
Snorkel Cap
.
The maximum horizontal run shall include no
more than a single 24” section of pipe. See
Figure 11.
„
The termination cap must not be recessed into the
wall or siding. Do not fill air space in wall around
termination cap with any type of insulation.
„
A minimum 11” X 11” square hole is required for
the proper pipe clearance through a wall pen-
etration. A 10” x 10” opening is suitable with use
of Simpson Dura-Vent Wall Thimble #942.
„
Any horizontal run of vent must be level or have
a 1/4” rise for every foot of run toward the
termination cap.
„
Prevent potential damage to vinyl siding with
installation of a Vinyl Siding Standoff between
the vent cap and the exterior wall.
Standard Horizontal
termination cap
(#984, #985)
Minimum vertical
rise with horizontal
termination: 24”
Maximum
horizontal with 2
ft. vertical is 12”
 90°  Elbow
(#990B)
Figure 10. A vertical run in a horizontal termination
must be at least 2 feet (61 cm).
Figure 11.  Rear Exit Horizontal Termination.
36” Snorkel
Maximum horizontal
run into a 36” Snorkel:
24” (610 mm )
Rear Exit
Position
24 ”
610 mm
58 1/2”
(148.6 cm)
center line
with required
2ft. rise and
90° elbow