3.3.3  Running the Optional Step Test 
Introduction 
You can test the recorder’s mechanical operation by running a “step test”. This test is initiated by setting 
switches as described in Table 3-4.   
This test prints a step pattern, which is independent of any chart settings, with horizontal lines drawn by 
both pens at each 10% increment on the chart (see Figure 3-4).  
The test will run for one complete revolution of the chart before it returns to normal operation. The chart 
revolution for the test takes approximately three minutes, regardless of configured chart speed. 
 
WARNING 
 
SHOCK HAZARD 
When the unit is powered a potentially lethal shock hazard exists at the AC line connections at TB1 on 
each printed circuit assembly (behing the chart plate). Make sure the unit power is disconnected before 
starting the procedure. More than one switch may be required to de-energize the recorder. 
Failure to observe this precaution can result in exposure to a potentially lethal shock hazard.
 
 
Procedure 
Use the procedure in Table 3-4 to run the step test.   
Table 3-4  Procedure for Running the Step Test 
Step Action/Result 
Graphic 
Turn off the power to the recorder.  
 
Make sure the cap is removed from the tip of each pen 
and the chart is installed. 
 
Loosen captive screw and swing out the chart plate. 
 
Note the position of all eight switches on SW1 on the 
printed circuit assembly (PCA) for each pen. 
Being careful of the shock hazard at TB1
, set 
switches 1 and 2 in SW1 in the OFF position on each 
pen’s PCA. All other SW1 switches should be ON 
(toward the edge of the board). This is configuration 
#252 in Table 3-2. 
8
7
6
5
4
3
2
1
ON
 
Being careful of the shock hazard at TB1
, place run 
switch SW5 to the setup position (toward the top of the 
board) on each pen’s PCA. 
 
Apply power to the recorder. 
 
The recorder will begin the test. The duration of the test 
is approximately 3 minutes. (When the test has been 
completed the pens will move away from the test 
position, but the recorder cannot return to normal 
operation until the switches are returned to their 
correct non-test settings
.)