Haier 3000 User Manual

Page of 56
English
4
installation Preparation 
To install this range hood, you will need the following tools and materials: 
note: this procedure will require 2 people for easier installation.
tools needed for installation
• Drill  
• 1/8” Drill bit for drilling pilot holes 
• 1-1/4” Wood bit for drilling electrical wiring access hole 
• Phillips head screwdriver 
• Flat-head screwdriver 
• Pliers 
• Pencil, ruler and level for marking range hood location 
• Hand saw or jig saw for cutting the wall or cabinet openings 
• Hi-Temp duct tape 
• Electrical tape 
• Connector Clamp 
 
 
 
Preparing Hood Location
1.   Determine whether hood will discharge vertically (3¼” x 10” or 7” Round), 
horizontally (3¼” x 10” only) or non-ducted. For vertical or horizontal discharge, 
run ductwork between the hood location and a roof cap or wall cap. For best 
results, use a minimum number of transitions and elbows.
2.   Use diagram, below, for proper placement of ductwork and electrical cutout in 
cabinet or wall. For a non-ducted installation, DO NOT cut a duct access hole. 
3.  Run house wiring between service panel and hood location.