GE Surface Time-Saving Wellheads Brochure

Page of 2
GE Oil & Gas
Time-Saving Wellheads
Pressure Control SH2 Split Speedhead
 System
The SH2 Split Speedhead™ System offers significant time-
saving and safety-enhancing advantages over conventional 
wellheads and is compatible with today’s advanced drilling 
methods. The speedhead is a multi-bowl system, supporting 
and sealing two strings of pipe in a single head. Safety is 
improved and installation time reduced by running, landing 
and sealing the two strings without removing the BOP stack. 
The system will save approximately 17 hours of rig time: 12 
hours of BOP manipulation and 5 hours by using a mandrel 
hanger/packoff rather than a slip hanger. By using a weldless 
casing connector (Surelok or LRC), an additional 8 hours can 
be saved.
The difference between a conventional multi-bowl and an SH2 
speedhead system is the wellhead housing. The SH2 housing 
consists of two pieces — a lower housing and an upper 
housing — installed as one unit. If the intermediate casing 
becomes stuck, preventing the mandrel hanger from landing 
in the bowl, then the two housings can be separated. Then the 
emergency slip-style casing hanger can be easily installed and 
the casing cut using conventional installation methods.
Features —
 
• Field-proven
 
• Increases safety
 
• Saves installation time
 
• Reduces BOP/diverter handling
 
• Flexible system
 
– Emergency equipment
 
– Alternate casing programs
295-2721
Top Flange 
Size
Top Flange 
Pressure (psi)
Surface 
Casing
Casing for 
Lower Hanger
Casing or Tubing 
for Upper Hanger
11”
3,000/5,000/ 
10,000
9-5/8”
7”
2-3/8” thru 4-1/2”
10-3/4”
7-5/8”
2-3/8” thru 5-1/2”
13-5/8”
3,000/5,000/ 
10,000
13-3/8”
7”
2-3/8” thru 4-1/2”
7-5/8”
2-3/8” thru 5”
8-5/8”
2-7/8” thru 5-1/2”
9-5/8”
2-7/8” thru 7”
10-3/4”
2-3/8” thru 7-5/8”
16-3/4”
5,000
16”
10-3/4”
2-3/8” thru 7-7/8”
11-3/4”
2-3/8” thru 7-3/4”
Operation
Conventional
SH2 System
Cut Pipe and Weld on Starting Head
As Required
As Required
Wait-on-Cement Intermediate Casing
As Required
As Required
Release Hanger Running Tool and Wash Out
N/A
1 Hour
Install and Test Annular Seal
N/A
1 Hour
Break Connection and Lift BOP Stack
4 Hours
N/A
Install Slip Hanger and Rough Cut Casing
3 Hours
N/A
Final Cut Casing and Install Intermediate Spool
4 Hours
N/A
Nipple-Up BOP Stack
8 Hours
N/A
Test BOP Stack
As Required
As Required
Tubing Completion
As Required
As Required
Totals
19 Hours
2 Hours
Time Saved (17 Hours) x Hourly Rig Rate = Money Saved
Typical Time Savings with SH2 System —
 
• Accepts standard completion equipment
 
• Mandrel hangers rated to joint strength of suspended 
casing
 
• Fluted mandrel casing hanger allows cement returns up 
through BOP stack
Availability —