Cisco Cat alyst 4900M Sw itch Instal lation Guid e
78-18350-02
Chapter 3      Installi ng t he Switch
  Rack-Mount ing the Switch
  –
The rack must have sufficient vertical clearance to ins ert the chassis. The chassis heig ht is 2 U 
(3.5  inches (8.9 cm)).
  •
The equ ipmen t rack is stab le and in no dan ger of falling  over.
  –
Ensu re th at the sh elf is constructed  to sup port the weight an d dimen sions of the ch assis. Fo r 
physical sp ecificatio ns, see 
  –
We recommend that you  b olt th e rack to th e floor.
  –
Mount the unit at the b ottom of the rack  if it is the o nly unit in the rack.
  –
Ins tall heavier equipment in the lower h alf o f the rack to maintain  a low center of g ravity and  
prevent th e rack from becoming  top -heav y and  tipp ing over. 
  –
Ins tall the stabilizers befo re moun tin g or servicing th e switch  in the rack (if th e rack is  prov ided  
with stabilizin g devices).
  •
The equ ipmen t rack is pro perly ventilated.
  –
Ins tall the chassis in  an en closed rack only if it h as adeq uate ven tilation  or an ex hau st fan ; use 
an  op en  rack wh enever possible.
  –
Ensu re th at the ambient temperature o f the rack env iron ment does not ex ceed  a max imu m 
temp eratu re o f 104
°F (40°C). Note that if the switch is installed in a closed or multiunit rack 
ass embly, the ambient operating temp eratu re of th e rack environment migh t be higher than th e 
amb ient room temperature.
  –
Note that a ventilation system in a clo sed  rack that is  too  p owerful mig ht also prevent co oling 
by creating negative pressure around the chassis and redirecting the air away from th e chas sis 
intake vent. If necessary, o perate the chassis with the rack  op en . 
  –
To prevent airflow restriction, allow at least 3 inch es (7.6  cm) of clearance aroun d th e 
ven tilation  op enin gs on the sid es of th e chass is .
  –
Use baffles correctly to assist in cooling the chassis.
  –
Note that eq uipment near the bottom of a rack  may g enerate ex cessive h eat that is drawn  upward 
an d in to the intake po rts of equip ment above, leadin g to ov ertemperature cond itio ns in the 
ch assis at o r near the top of the rack. 
  –
Consider  the equip ment  and  cabling  that is  already  in stalled in  the rack. Ensure that cab les fro m 
other  eq uipment will not  obstruct the airflow  through  the chassis o r  impair access  to the  power 
supplies or switching modu les. Rou te cables away from field-replaceable components to avoid 
disconnectin g cables u nnecessarily for equipment main tenance or upgrad es.
  –
Allow at least 3 to  4 feet (91 .4 to 121 .9  cm) of clearance behind the rack for mainten ance and 
removal of switch assemblies. If the rack  is mobile, y ou can push  it back  within 1 foo t (30.45 
cm) of a wall or cabinet for no rmal operation an d p ull it ou t when n ecessary for maintenance. 
Lifting the Chassis Safely
The chassis is not intended to b e moved frequ ently. Befo re y ou install the switch, ensu re th at you r site 
is p rop erly p repared so th at you can  avoid mo ving the chassis later to acco mmodate power sou rces  and 
network con nections. 
Wh enever you lift a chassis or any heavy  ob ject, follow these gu idelin es:
  •
Ensu re th at your foo ting is s olid, and balan ce the weigh t of the chassis between you r feet.
  •
Lift the ch assis slowly; n ever move su ddenly or twist yo ur bo dy as you  lift.