Delta Tau GEO BRICK LV User Manual

Page of 440
 
Turbo PMAC User Manual 
296
 
Writing and Executing Motion Programs 
Line
Line
Line
Line
Programmed
Path
Tool Center
Path
Line
Line
Programmed
Path
Tool Center
Path
Arc
Arc
Line to Line
Line to Arc
Arc to Arc
Arc to Line
Line
Line
Programmed
Path
Tool Center
Path
Spiral
Arc
Spiral
Arc
Introducing Compensation – Inside Corner
Programmed
Path
Tool Center
Path
Arc
Arc
r
r
r
r
CC2
CC2
CC2
CC2
 
Outside Corner Introduction 
If the lead-in move and the first fully compensated move form an outside corner, the lead-in move first 
moves to a point one cutter radius away from the intersection of the lead-in move and the first fully 
compensated move, with the line from the programmed point to this compensated endpoint being 
perpendicular to the path of the lead-in move at the intersection.  When the lead-in move is a LINEAR-
mode move, this compensated tool path will be at a diagonal to the programmed move path.   
When the lead-in move is a CIRCLE-mode move, this compensated tool path will be a spiral.  Then a 
circular arc move with radius equal to the cutter radius is added, ending at a point one cutter radius away 
from the intersection of the lead-in move and the first fully compensated move, with the line from the 
programmed point to this compensated endpoint being perpendicular to the path of the first fully 
compensated move at the intersection. 
Line
Line
Programmed
Path
Tool Center
Path
Line
Line
Line
Line
Programmed
Path
Tool Center
Path
Arc
Arc
Line to Line
Line to Arc
Arc to Arc
Arc to Line
Line
Line
Programmed
Path
Tool Center
Path
Arc
Spiral
Arc
Arc
Spiral
Arc
Introducing Compensation – Outside Corner
Programmed
Path
Tool Center
Path
Arc
Arc
r
r
r
r
r
r
r
r
CC2
CC2
CC2
Arc
CC2