AVG Anti-Virus 8.5 - 5 lic. - 2 year AAV8N24BCZS005 User Manual

Product codes
AAV8N24BCZS005
Page of 141
87
AVG 8.5 Anti-Virus © 2008 Copyright AVG Technologies CZ, s.r.o. All rights reserved.
Next , give a name t o t he program updat e schedule you are about  t o create. Type t he
name into t he t ext  field by t he Name item. Try t o use brief, descriptive and
appropriate names of update schedules t o make it  easier t o recognize t he schedule
among ot hers lat er.
 Schedule running  - specify t he t ime int ervals for t he newly scheduled
program update launch. The t iming can eit her be defined by t he repeated
updat e launch aft er a cert ain period of t ime (Run every ...) or by defining an
exact  dat e and t ime (Run at specific time ...),  or possibly by defining an
event  t hat t he updat e launch should be associat ed with (Action based on
computer startup
).
 Advanced schedule options - t his sect ion allows you t o define under which
conditions t he program update should/should not be launched if t he computer
is in low power mode or switched off completely.
 Other update settings - check t his opt ion t o make sure t han if t he int ernet
connect ion get s corrupted and t he update process fails, it  will be launched
again immediat ely aft er t he int ernet connect ion is rest ored.
Once t he scheduled scan is launched in t he t ime you have specified, you will be
informed on t his fact  via a pop-up window opened over t he 
provided that you have kept the default configuration of the the 
 dialog).