Westinghouse WBCNG399WPU Installation Instruction

Page of 90
17 
 
 
 
WHL-016 REV. 3.4.15 
 
NOTE: DAMAGE TO THE BOILER CAUSED BY EXPOSURE TO 
CORROSIVE VAPORS IS NOT COVERED BY WARRANTY. 
(Refer to the 
limited warranty for complete terms and conditions). 
G. REMOVING AN BOILER FROM A COMMON VENT SYSTEM 
 
Do not install the boiler into a common vent with any other boiler. This will 
cause flue gas spillage or boiler malfunction, resulting in possible 
substantial property damage, severe personal injury, or death. 
 
 
Failure to follow all instructions can result in flue gas spillage and carbon 
monoxide emissions, causing severe personal injury or death. 
 
When removing an existing boiler, the following steps must be followed. 
 
1. Seal any unused openings in the common venting system. 
 
2. Visually inspect the venting system for proper size and horizontal pitch to 
determine if there is blockage, leakage, corrosion or other deficiencies that 
could cause an unsafe condition. 
 
3. If practical, close all building doors, windows and all doors between the common venting system and other spaces in the building. 
Turn on clothes dryers and any boilers not connected to the common venting system. Turn on any exhaust fans, such as range hoods 
and bathroom exhausts, at maximum speed. Do not operate a summer exhaust fan. Close all fireplace dampers. 
 
4. Place in operation the boiler being inspected. Follow the lighting instructions. Adjust the thermostat so the boiler will operate 
continuously. 
 
5. Test for spillage at the draft hood relief opening after 5 minutes of main burner operation. Use the flame of a match or candle or 
smoke from a cigarette. 
 
6. After it has been determined that each boiler remaining connected to common venting system properly vents when tested as 
outlined, return doors, windows, exhaust fans, fireplace dampers and any other gas burning boiler to their previous condition of use. 
 
7. Any improper operation of the common venting system should be corrected so the installation conforms to the National Fuel Gas 
Code, ANSI Z223.1. When resizing any portion of the common venting system, the common venting system should be resized to 
approach the minimum size as determined using the appropriate tables in Appendix G in the National Fuel Gas Code, ANSI Z 223.1. 
PART 4 – PREPARE BOILER 
 
UNCRATING BOILER 
– Any claims for damage or shortage in shipment must be filed immediately against the transportation company 
by the consignee. 
 
 
Cold weather handling 
– If boiler has been stored in a very cold location (below 0
o
F) before installation, handle with care until the plastic 
components come to room temperature. 
A. REMOVE THE BOILER FROM PACKAGING 
Remove all sides of the shipping crate, and the wooden block that holds the boiler in place during shipping. Slide the boiler from the 
mounting bracket, which is affixed to the skid (Figure 4 and 5). Remove the mounting bracket from the crate (Figure 5). Take care to 
place the boiler in a safe location prior to installation to prevent damage to the mechanical connections.  
Figure 3 
– CO Warning Label