PART 7 – GAS PIPING 
 
FAILURE TO FOLLOW ALL PRECAUTIONS IN THIS SECTION COULD RESULT IN FIRE, EXPLOSION, OR DEATH! 
A. GAS CONNECTION 
The gas supply shall have a maximum inlet pressure of less than 14" 
w.c. (3.5 kPa), and a minimum of 3.5" w.c. (.87 kPa). The entire piping 
system, gas meter and regulator must be sized properly to prevent 
pressure drop greater than 0.5" (.12 kPa) as stated in the National Fuel 
Gas Code. This information is listed on the rating label. 
 
NOTE: 
Maximum inlet gas pressure must not exceed 14” w.c. (3.5 
kPa). 
 
*NOTE: Installer must supply trap to meet local code requirements. 
 
 
It is very important that you are connected to the type of gas noted on 
the rating plate. 
“LP” for liquefied petroleum, propane gas, or “NAT” for 
natural  or  city  gas.  You  must  not  do  a  gas  conversion  without  an 
approved  gas  conversion  kit.  Prior  to  turning  the  gas  on,  all  gas 
connections  must  be  approved  by  the  local  gas  supplier  or  utility,  in 
addition to the governing authority. 
 
A  gas  conversion  kit  comes  with  the  boiler.  Follow  the  included 
instructions  VERY  carefully.  Failure  to  follow  gas  conversion 
instructions could result in property damage, serious injury, or death. 
 
 
 
 
 
 
 
Do not attempt to support the weight of gas piping with the boiler or its accessories. The gas valve and blower will not support the 
weight of the piping. Failure to follow this warning could result in substantial property damage, severe personal injury, or death. 
 
The gas connection on the boiler 
is 3/4”. It is mandatory that 
this fitting is used for connection to a field fabricated drip leg as 
shown in Figure 26 per the National Fuel Gas Code. You must 
ensure that the entire gas line to the connection at the boiler is 
no smaller than the boiler supplied connection. 
 
Once all inspections have been performed, the piping must be 
leak tested. If the leak test requirement is a higher test pres-
sure than the maximum inlet pressure, you must isolate the 
boiler from the gas line. In order to do this, shut the gas off 
using factory and field-installed gas cocks. This will prevent 
high pressure. Failure to do so may damage the gas valve. 
 
In the event the gas valve is exposed to a pressure greater 
than ½ PSI, 14" w.c., or 3.5 kPa, the gas valve must be 
replaced. Never use an open flame (match, lighter, etc.) to 
check gas connections. 
B. GAS PIPING 
1. Run the gas supply line in accordance with all applicable codes. 
 
2. Locate and install manual shutoff valves in accordance with state and local requirements. 
 
3. In Canada, the Manual Shutoff must be identified by the installing contractor. 
Table 15 
– Gas Pipe Sizing / BTU’s per Hour
 
Figure 26 
– Gas Line