Wegener Communications IPUMP 562 User Manual

Page of 68
 www.wegener.com
800092-01 Rev. A
 21
Unity 552 User’s Manual 
Table 3.5: Indicator Threshold screen options
Signal Strength Meter screen
Use following steps to display 
Signal Strength Meter
 screen on the OSD menu: 
1. Press any push-button on the front-panel to display the 
Main Menu
.
2. Press the down arrow button to select 
Carrier Settings
.
3. Press 
Enter
.
4. Press the down arrow button to select 
Signal Strength Meter
.
5. Press 
Enter
 to view the screen as shown in 
 Figure 3.9:   iPump 562 OSD Signal Strength Meter Screen
Set Subtitling 
options
Subtitling Setup screen
Use following steps to display 
Subtitling Setup
 screen on the OSD menu:
1. Press any push-button on the front-panel to display the 
Main Menu
2. Press the down arrow button to select 
Subtitling Setup
.
3. Press 
Enter
.
4. View the details as shown in 
Option
Possible values
Comments
Errored Secs per Min
10 to 19
Set the threshold for how many errors per 
minutes before raising a warning condition.