Vermont Casting ACSB User Manual

Page of 10
9
Addison Electric Stove
10004324
1. Unplug the electrical supply to the unit.
2. Allow the stove to cool if it has been operating.
3. Move the stove away from the wall to gain access to
the rear of the unit.
4. Locate the firebox mounting brackets on the side of
the firebox. Remove the screws securing the firebox
to the mounting brackets. (Fig. 3)
5. Remove firebox by sliding it rearward out of the
casting.
6. Gently place firebox on its back on the floor.
7. Locate the glass clips on the inside surface of the
front casting. Remove the glass, and clear the area
of any glass fragments. (Fig. 5)
8. Secure new glass (with gasket) to the inside surface
of the front casting, reversing the process above,
making sure the glass is placed with gasket covering
the bottom and sides of the glass. (Fig. 5)
9. Reinstall firebox into casting, by reversing steps 1
through 6.
Door Glass Replacement Instructions
Fig. 5  Door assembly.
Glass
Glass
Clips
Gasket
HS107
Door Glass Replacement Parts
Glass - Addison
30000664
Gasket, 3/4” Flat Window-Blk
30000776
Clip
1601396
Knob, Therm-Maple
1600660
Control Door Handle Assy
10004442
  Shell Enamel Part Numbers - Addison ACSB, ACSG, ACSM
Color
Top
Front
End,
Leg
Right, Left
(2 per stove)
Classic
30000624
30000621
30000622
30000623
Midnight
30000790
30000787
30000788
30000789
Green
30000794
30000791
30000792
30000793