U.S. Department of Defense Test Sets Electron Tube TV-2A/U User Manual

Page of 82
T
E C H N I C A L  
M
A N U A L
N o .   1 1 - 6 6 2 5 - 3 1 6 - 1 2
T
E C H N I C A L  
O
R D E R
* TM 11-6625-316-12
D E P A R T M E N T S   O F   T H E   A R M Y
A N D   T H E   A I R   F O R C E
W
A S H I N G T O N  
25, D. C., 
16 March 
1 9 6 1
TEST SETS, ELECTRON TUBE TV-2/U, TV-2A/U,
Section I.
II.
Section I.
I I .
III.
IV.
AND TV-2 B/U
P a r a g r a p h
Genera’
Scope _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Forms and records _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Description and data
Purpose and use _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Technical characteristics    _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Components of Test Set, Electron Tube
TV-2(*)/U.
Description of Test Set, Electron Tube
TV-2(*)/U.
Differences in models _ _ _ _ _ _ _ _ _ _
OPERATION
Service upon receipt of equipment
Unpacking _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Checking unpacked equipment _ _ _ _ _ _ _ _ _ _ _ _
Operator’s controls and indicators  _ _ _ _ _ _ _ _ _
Damage from improper settings _ _ _ _ _ _ _ _ _
Operating controls and indicators _ _ _ _ _ _ _
Tube test data _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Preliminary operating procedures
Operating precautions _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Tube test sockets and test adapters _ _ _ _ _ _ _ _ _ _ _ _
Preliminary starting procedure _ _ _ _ _ _ _ _ _ _ _
Operation under usual conditions
Starting procedures _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Zero adjustment of PERCENT QUALITY
meter.
P a g e
 This manual supersedes so much of TM 11-2661, 11 May 1955, including
C4, 8 November 1957; C5, 21 April 1958; C6, 15 May 1959, as pertains to
operator’s and organizational maintenance and so much of TM 11-6625-316-
12P, 23 July 1959, as pertains to the basic issue items list and the maintenance
allocation chart.
1