Gaggenau DF251761 Installation Instruction

Page of 30
5
Electrical Supply Cable
  -  Minimum  #14 AWG,  2  conductor,  1 
ground, insulated copper conductors rated 75°C or higher
Hot Water Supply Line - Minimum 
3
/
8
″ O.D. copper tubing or metal 
braided dishwasher supply line
Shut-off valve and fittings appropriate for hot water supply line 
(copper tubing/compression fitting, or braided hose)
UL listed conduit connector or strain relief is required if you attach 
the field wiring directly to the terminal block
Hammer
Hole Saw
Pipe Wrench
Tape Measure
Slot Screwdriver
Phillips Screwdriver
Torx T-20 Screwdriver
Wire Cutter
Wire Stripper
Ø 2 mm (
1
/
16 
in) Drill
Level
Adjustable Wrench
Tools and Materials Needed
Inspect the Dishwasher
After unpacking the dishwasher and prior to installation, 
thoroughly inspect the dishwasher for possible freight 
or cosmetic damage. Report any damage immediately. 
Cosmetic defects must be reported within 30 days of 
installation.
NOTE: Do not discard any bags or items that come with the 
original package until after the entire installation has been 
completed.
5