STEP 1 CONSTRUCT CEILING SUPPORT
Plan the location
Determine the exact location of the vent hood.
• Use a plumb bob to check location to be sure
Determine the exact location of the vent hood.
• Use a plumb bob to check location to be sure
countertop/cooktop location below the hood will
align exactly.
align exactly.
• The hood should project forward 1-1/2" beyond the front
edge of the cooking appliance. See illustration.
• Observe the recommended space (30") between the
cooking surface and bottom of hood.
Ceiling
Hood
Ducting
Centerline
Ducting
Centerline
Side View
Approx. 1-1/2"
Beyond Cooking
Surface
Beyond Cooking
Surface
Cooktop
Countertop
31-1/2"
Hood
Front
15-3/4"
Ceiling support structure
• At the hood location, install 2 x 4 cross framing
• At the hood location, install 2 x 4 cross framing
between ceiling joists as shown. (2x4s are required
to support the weight of the hood.)
to support the weight of the hood.)
• Arrange cross framing in the ceiling to suit the
existing structure.
• Your ceiling joists will be like one of the following
examples.
11-1/4" Install Cross-Framing
Symmetrically About
Duct/Cooktop Centerline
7-1/4"
16" Joist
Spacing
2x4 Cross
Framing
Framing
8" Duct
Align Duct to Center
of Cooktop
of Cooktop
Cooktop
Outline
Outline
Top View—Ceiling Joists Parallel to Front of Hood
Front
of Hood
EXAMPLE A