Viking VCSB5423GG Installation Guide

Page of 36
31
 Performance Checklist
  
—Verify cabinet size.
  
— Verify electrical supply and water 
supply (if applicable).
   
— Install anti-tip device and verify unit is 
secure.
  
— Position unit in cutout, level at desired  
 height and secure unit.
  
—Plug-in unit and verify operation.
  
—Connect water supply (if applicable).
 
  • Verify icemaker fi ll tube is properly  
  
inserted.
 
  • Verify icemaker bail arm is down.
  
• 
 
Verify dispenser operation
  
 (if 
applicable).
   
—Align/square door(s).
  — 
Verify drain pan is properly installed 
and there are no leaks on water 
connection.
   
—Install kickplate.
   
— Remove internal packaging and labels  
 and wipe unit down.
Installer’s information:
Installer’s name:__________________________
Installer’s company:_______________________
Date: ___________________________________