Thermador PH42GS Installation Instruction
English 10
Cabinet Installation
The hood can be installed under a cabinet by supporting
the hood from the top.
the hood from the top.
Note:
The cabinet must be structurally joined to the wall studs to
support the weight of this hood.
The cabinet must be structurally joined to the wall studs to
support the weight of this hood.
Figure 14 shows the (4) screw holes labeled “K” used for
mounting the hood to the bottom of the cabinet. Make sure
both knockouts have been removed.
mounting the hood to the bottom of the cabinet. Make sure
both knockouts have been removed.
1.
In the base of the cabinet, drill 1/8” (3mm) tap holes
(Dimension A in Figure 14 and in Table 2,). Screw in
(4) 1" (25mm) screws (provided with hood) leaving 1/4”
(6mm) exposed to hang hood on.
(Dimension A in Figure 14 and in Table 2,). Screw in
(4) 1" (25mm) screws (provided with hood) leaving 1/4”
(6mm) exposed to hang hood on.
2.
If the hood is installed for vertical discharge, use
Figure 14 to create clearance holes for passage of the
transition and conduit (see Dimension B in Figure 8
and in Table 2 on the current page).
Figure 14 to create clearance holes for passage of the
transition and conduit (see Dimension B in Figure 8
and in Table 2 on the current page).
3.
For horizontal discharge, use Figure 9 on page 8 for
the geometry of the cutout required for clearance of the
transition.
the geometry of the cutout required for clearance of the
transition.
4.
Hang hood from screws and tighten securely.
5.
From inside of hood, insert screws supplied. Drill
through holes, use 5/8” (16mm) screws supplied, (1) on
each side and (4) along the front, into bottom of the
cabinet. See screw holes labeled "L" in Figure 14.
through holes, use 5/8” (16mm) screws supplied, (1) on
each side and (4) along the front, into bottom of the
cabinet. See screw holes labeled "L" in Figure 14.
Blower Installation
®
blowers
with THERMADOR
®
ventilation hoods. All blower models
are sold separately. See page 1 for recommended blowers
and for max current ratings.
and for max current ratings.
1.
The blower is attached to the hood using weld studs
provided on the mounting plate.
provided on the mounting plate.
2.
Figure 15 shows the weld studs in location B for
horizontal (rear) discharge. Attach (4) nuts (included
with hood) to the weld studs. For vertical discharge,
attach nuts to studs at the top of the mounting plate.
horizontal (rear) discharge. Attach (4) nuts (included
with hood) to the weld studs. For vertical discharge,
attach nuts to studs at the top of the mounting plate.
3.
Guide the motor mounting plate over the studs and
tighten nuts to secure the blower to the hood.
tighten nuts to secure the blower to the hood.
Figure 14: Tap Hole and Screw Hole Locations
A
L
K
L
L
Tap Hole Locations
K
7
1
/
16
”
(17mm)
1
9
/
16
”
(40mm)
23”
(584mm)
Note:
This figure
depicts tap hole
and screw hole locations only. See
Figure 1 on page 1, for overall
hood dimensions.
hood dimensions.
HOOD
SIZE
SIZE
A (Fig 13)
Tap Holes
Tap Holes
B (Fig 7)
Conduit Holes
Conduit Holes
30” (762mm)
29” (736mm)
13” (330mm)
36” (914mm)
35” (889mm)
16” (406mm)
42” (1067mm)
41” (1041mm)
19” (483mm)
48” (1219mm)
47” (1194mm)
22” (559mm)
54” (1372mm)
53” (1346mm)
25” (635mm)
Figure 15: Weld Stud Locations
B
B