Elica ECN6XS2 Installation Instruction

Page of 21
 
 
Installation 
 
Installation - Ducting version 
1. Pre-installation calculations
 
 
K
 = Kitchen Height 
C = Counter Height (36" standard) 
P = Prefered Height of Hood  
    Bottom above counter  (Recommended 24”-30”) 
H = Hood height your installation 
H = K – C – P  
S = Chimney Structure Height, your installation. 
S = H - 1" 3/8. 
 
a) Select a hood preference height P  that is comfortable for 
the user. (from 24”  to 30“). 
b) Calculate Hood height your installation H = K-C-P. 
c) Confirm that H is within the range of min to max H found 
for your model (See “Dimensions and clearances” 
paragraph). If not adjust your installation. 
d) Calculate Chimney structure height S. Save this 
calculation for use later in the installation. 
 
 
 
Ceiling Support Structures 
 
•  This vent hood is heavy. 
 
Adequate structure and support must be provided in all 
types of installations. 
•  At the hood location, install 2"x 4" cross framing between 
ceiling joists as shown. (2"x 4" are required to support 
the weight of the hood.) 
•  Arrange cross framing in the ceiling to suit the existing 
structure. 
•  Your ceiling joists will be like one of the following 
examples. 
 
IMPORTANT 
Framing must be capable of supporting 150lbs.