APC SUVTP10KH2B2S User Manual

Page of 4
3
Sea packaging. 
Stabilizing Brackets
Attach stabilizing brackets
Caution: After unpacking always install the stabilizing 
bracket (shipped with the UPS) to the 352 mm (13.85 in) 
enclosure.
Note: This equipment is easily tipped. Use extreme caution 
when unpacking and moving the equipment to its final 
location. 
 Use the screws (which attached the transport brackets to the UPS) to 
fasten the stabilizing bracket to the UPS.
Move the UPS with stabilizing brackets
 Loosen the screws, push the brackets upwards and tighten the screws.
 Push the brackets downwards when the UPS is at its final position and 
tighten the screws.
 Cut carefully along the 
edges to remove the plastic 
and to free the ramp.
 Place the ramp by aligning 
the velcro strips on the ramp 
with the velcro strips on the 
front edge of the pallet.
 Remove the cardboard 
cover.
 Cut along the edges of the 
cardboard cover and remove 
it.
 Remove the corner 
protection and the plastic 
bag.
 Remove the bolts from the 
brackets attaching the 
enclosure to the pallet and 
save the brackets for floor 
anchoring, if required. 
 Roll the unit off the pallet.
Ramp