Make sure that the material demand sensor is installed with the proper amount of clearance, 
and that it is free of obstructions. 
If the installation has the SSL/CSL or SSIL/CSIL Series hopper loader wired directly to a 
power main, you must install a fused disconnect with lockout to allow safe operation and 
maintenance. Make sure all connections are tight
3-9  Installing the Remote Control Box 
Optional-Series One Plus Controller Only 
The remote option permits mounting a control up to 9 feet 
(2.75 m) from the primary control box. Both controls remain operational. 
 
!
 
WARNING
 
 
HAZARDOUS ELECTRICAL CURRENT 
PRESENT. 
 
To avoid burn or electrocution hazard, 
disconnect electrical power before
 
installing this option! 
 
 
1. 
Install the SSL/CSL or SSIL/CSIL Series hopper loader. 
2.  Select a location for the remote box and mount it securely. 
3.  Plug the cable supplied into the 25-pin receptacle on the hopper 
loader controller. Route the cable to the remote box so it doesn’t 
interfere with processing operations. Observe all applicable 
electrical codes. 
4.  Connect the cable to the receptacle on the remote control 
enclosure. 
Both controls are now fully operational. 
• 
Main power supervision is available on the hopper-mounted 
control only.
 
3-10 Adjusting the Proximity Switch 
SSIL/CSIL Series Sight Glass Loaders with Series One Plus Controllers Only 
The proximity switch, mounted through the side of the hopper loader tank, senses when the 
hopper loader is full. It is factory-set to sense most conveyed materials accurately, and