Sterling SSL User Manual

Page of 66
 
26
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
1 2 3 4 
 
1 2 3 4 
 
1 2 3 4 
 
1 2 3 4 
BLOWBACK    
  
  
  
 
ON 
  
  
  
 
  
ON 
  
  
 
ON ON    
  
PULSES  OFF OFF OFF OFF  
  
OFF  OFF  OFF   
OFF 
  
OFF  OFF   
  
  
OFF  OFF 
 
OPEN   OPEN  OPEN  OPEN 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
1 2 3 4 
 
1 2 3 4 
 
1 2 3 4 
 
1 2 3 4 
  
  
ON 
  
 
ON 
  
ON 
  
 
  
ON 
ON 
  
 
ON  ON 
ON 
  
BLOWBACK OFF OFF    
OFF   
  
OFF 
  
OFF   
OFF 
  
  
OFF   
  
  
  
OFF 
PULSES 
OPEN   OPEN  OPEN  OPEN 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
BLOWBACK 
1 2 3 4 
 
1 2 3 4 
 
1 2 3 4 
 
1 2 3 4 
PULSES 
  
  
  
ON 
 
ON 
  
  
ON 
 
  
ON 
  
ON 
 
ON  ON 
  
ON 
 
OFF OFF OFF 
  
 
  
OFF  OFF 
  
 
OFF 
  
OFF 
  
 
  
  
OFF 
  
 
OPEN   OPEN  OPEN  OPEN 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
BLOWBACK 
1 2 3 4 
 
1 2 3 4 
 
1 2 3 4 
 
1 2 3 4 
PULSES 
  
  
ON 
ON 
 
ON 
  
ON 
ON 
 
  
ON 
ON 
ON 
 
ON  ON 
ON 
ON 
 
OFF OFF    
  
 
  
OFF 
  
  
 
OFF 
  
  
  
 
  
  
  
  
 
OPEN   OPEN  OPEN  OPEN 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note:  Figure 9 contains two (2) different programs (6 and 7 
blowback pulses). 
 
4-6  Shutting Down the Hopper Loader Using the Series One 
Controller 
„
 
Move the power switch on the Series One graphic panel to the OFF 
position.  For maintenance or for a long-term shutdown, unplug the 
unit from the power source
 and shut off the compressed air supply.
 
 
-Notes-
15 SECONDS 
10 SECONDS 
20 SECONDS 
25 SECONDS 
30 SECONDS 
35 SECONDS 
40 SECONDS 
45 SECONDS 
50 SECONDS 
55 SECONDS 
60 SECONDS 
70 SECONDS 
80 SECONDS 
90 SECONDS 
100 SECONDS 
120 SECONDS 
Figure 8: Conveying Dip Switch Chart, Program A0536814 
SSL/CSL 06, 11, 23 and 45 and SSIL/CSIL 06 and 11 Models