True Manufacturing Company TH-23 User Manual

Page of 13
............ www.truemfg.com ............
I N S TA L L AT I O N   M A N U A L   F O R 
T H   M O D E L S   -   ( H E AT E D   C A B I N E T S )
T H   M O D E L S   - 
( H E AT E D   C A B I N E T S )
CONGRATULATIONS!   
You have just purchased the finest commercial 
heated cabinet available.  You can expect many years 
of trouble-free operation.
TRUE FOOD SERVICE EQUIPMENT, INC.
2001 East Terra Lane • P.O. Box 970 • O’Fallon, Missouri 63366
(636)-240-2400 • FAX (636)272-2408 • INT’L FAX (636)272-7546 • (800)325-6152
Parts Department (800)424-TRUE • Parts Department FAX# (636)272-9471
TABLE OF CONTENTS
Safety Information
Safety Precautions   –––––––––––––––––––––––  1
Proper Disposal  ––––––––––––––––––––––––––  2
Connecting Electricity  –––––––––––––––––––––  3
Adapter Plugs   –––––––––––––––––––––––––––  3
Installation / Operation Instructions
Ownership   ––––––––––––––––––––––––––––––  4
Required Tools  –––––––––––––––––––––––––––– 4
Uncrating & Locating ––––––––––––––––––––––  4
Installation of Leg/Castors   –––––––––––––––––– 5 
Leveling Cabinet  –––––––––––––––––––––––––  6
Installing Ventilation Cap –––––––––––––––––––– 6
Humidification Procedure –––––––––––––––––––– 7
Electrical Instructions ––––––––––––––––––––––– 7
Sealing Cabinet to Floor ––––––––––––––––––––– 8
Start-up   ––––––––––––––––––––––––––––––––  9
Shelving Installation - Operation –––––––––––––– 9
Maintenance, Care & Cleaning
Stainless Steel Equipment Care & Cleaning – 10-11
Warranty (U.S.A. & CANADA ONLY!) –––––––––– 12
TH-23G
TH-23
*Spanish, German, French and Dutch versions included.
7/17/09 150 SB #912631